NEWSFOR IMMEDIATE RELEASE | ![]() |
HEATH STEEL SELECTED FOR TWO STEEL BUILDING PROJECTS ALONG FRONT RANGE
FORT COLLINS, COLO. – August 2, 2010 – Two recent project wins along the Front Range indicate that even during today’s slow construction cycle, Heath Steel (www.heathsteel.com) continues to be the “go-to” company for pre-engineered metal buildings.
In September, Heath Steel will supply materials and erect a 4,800-square-foot pre-engineered metal building for Dunrite Excavation. Dunrite, a subcontractor that offers earthwork and excavation services, will use the building as its shop and office.
In October, Heath Steel will supply materials for a 1,440-square-foot steel-building water treatment plant at the large Suncor Energy refinery in Commerce City, Colo. The massive refinery is the largest in the Rocky Mountain region. Mustang Engineering selected Heath Steel for the project.
“Supplying steel-building materials to top-quality companies like Mustang Engineering is a key focus of Heath Steel,” said Terry Been, Heath Steel general manager. “We can economically and quickly supply materials to general contractors and organizations, or provide an entire steel-building package that includes building design, materials and erection.”
Heath Steel is an authorized distributor of Chief Buildings, a leading metal building systems manufacturer well regarded for its extensive designs, durability and affordable prices.
Examples of high?profile metal buildings the Heath team has supplied and erected include the 85,000?square?foot Furniture Row in Dacono; 26,000?square?foot Thomas M. McKee 4?H and Community Building at the Larimer County Fairgrounds at The Ranch; and the 100,000?square?foot Parker Fieldhouse in Parker, Colo.
For more information about Heath Steel, visit www.heathsteel.com or call 970-490-8080.